LIU Ming, LIU Qi, BAI Jia, CHEN Rui. Reasons for Cracking of Nozzle Socket of Hot Section Drain Pipe of a660 MW Ultra-supercritical Unit[J]. Materials and Mechanical Engineering, 2021, 45(2): 90-95. DOI: 10.11973/jxgccl202102016
Citation: LIU Ming, LIU Qi, BAI Jia, CHEN Rui. Reasons for Cracking of Nozzle Socket of Hot Section Drain Pipe of a660 MW Ultra-supercritical Unit[J]. Materials and Mechanical Engineering, 2021, 45(2): 90-95. DOI: 10.11973/jxgccl202102016

Reasons for Cracking of Nozzle Socket of Hot Section Drain Pipe of a660 MW Ultra-supercritical Unit

More Information
  • Received Date: March 22, 2020
  • Revised Date: January 14, 2021
  • After short operation of the 660 MW ultra-supercritical unit of a thermal power plant, the nozzle socket of the drain pipe cracked in the hot section, causing steam leakage. The chemical composition, hardness and microstructure of the nozzle socket were analyzed. A three-dimensional solid model was established according to the actual layout of the pipe, and the force of the structure was simulated and analyzed by the thermo-solid coupling finite element method. The results show that the chemical composition, hardness, and microstructure of the nozzle socket met the requirements. The maximum stress obtained by the finite element simulation was located at the lower edge of the connection weld between the nozzle socket and the main pipe, which was consistent with the actual cracking position. The cracking was due to the limited ability of the drain pipe to absorb deformation, and the higher tensile stresses in the nozzle socket area induced by the blocked thermal expansion of the pipe because of the unreasonable pipe layout. After adding a U-shaped expansion bend to enhance the flexibility of the pipe and reduce the structural stress, the nozzle socket of the drain pipe did not crack during operation for about 1 a.
  • [1]
    俞葆青, 彭杏娜, 丛相州, 等. 超超临界机组疏水罐罐体泄漏原因分析及防治[J]. 中国电力, 2018, 51(9):83-87.

    YU B Q, PENG X N, CONG X Z, et al. Cause analysis and prevention of drainage-tank leakage in ultra-supercritical power plant[J]. Electric Power, 2018, 51(9):83-87.
    [2]
    张宇飞. 1030 MW超超临界机组再热热段疏水罐疲劳裂纹分析[J]. 热加工工艺, 2019, 48(2):257-260.

    ZHANG Y F. Study on fatigue crack of drain tank in reheat pipe of 1030 MW ultra-supercritical units[J]. Hot Working Technology, 2019, 48(2):257-260.
    [3]
    王斌. 高温蒸汽管道、联箱中小口径管座的开裂及防范措施[J]. 热力发电, 2003, 32(4):39-41.

    WANG B. Cracking of medium- and small-diameter tube sockets on high temperature steam pipelines and headers, as well as protective measures thereof[J]. Thermal Power Generation, 2003, 32(4):39-41.
    [4]
    姚兵印, 李太江, 康豫军, 等. 除氧头接管座焊缝开裂分析及修复[J]. 热力发电, 2010, 39(7):98-100.

    YAO B Y, LI T J, KANG Y J, et al. Analysis and repair of cracks in socket weld joint on dearator's head[J]. Thermal Power Generation, 2010, 39(7):98-100.
    [5]
    刘蛟, 郑会, 樊钊. 核电厂高压缸抽汽管线疏水管道焊缝泄漏原因[J]. 机械工程材料, 2018, 42(5):74-77.

    LIU J, ZHENG H, FAN Z. Reason for weld leakage of drain pipe of high pressure cylinder extraction line in a nuclear power plant[J]. Materials for Mechanical Engineering, 2018, 42(5):74-77.
    [6]
    李建杰, 石春生, 庾博园, 等. 汽轮机主蒸汽疏水管裂纹原因分析及处理措施[J]. 河北电力技术, 2013, 32(6):50-51.

    LI J J, SHI C S, YU B Y, et al. Cause analysis and settlements on turbine main steam pipes cracks[J]. Hebei Electric Power, 2013, 32(6):50-51.
    [7]
    邵玉萍, 李振亮, 闫世春. 接管座角焊缝常规超声波检测研究[J]. 无损探伤, 2019, 43(2):47-48.

    SHAO Y P, LI Z L, YAN S C. Research on routine ultrasonic inspection of fillet welds of nozzle base[J]. Nondestructive Testing Technology, 2019, 43(2):47-48.
    [8]
    火力发电厂汽水管道支吊架手册[R].西安:水利电力部西北电力设计院,1983. Manual of support and hanger for steam and water pipe in thermal power plant[R]. Xi'an:Northwest Electric Power Design Institute, Ministry of Water Resources and Electric Power, 1983.
    [9]
    唐永进.压力管道应力分析[M].北京:中国石化出版社,2003. TANG Y J. Stress analysis of pressure pipeline[M].Beijing:China Petrochemical Press, 2003.
    [10]
    尤伟芳, 曾燕屏, 王环丽, 等. P92钢蒸汽管道焊接接头中两裂纹相互作用的有限元分析[J]. 压力容器, 2017, 34(8):57-65.

    YOU W F, ZENG Y P, WANG H L, et al. Finite element analysis of interaction of two surface cracks in welded joint of a steam pipe made of P92 steel[J]. Pressure Vessel Technology, 2017, 34(8):57-65.
    [11]
    姜运建. P92钢焊接残余应力场及对高温寿命的影响研究[D]. 天津:天津大学, 2011.

    JIANG Y J. Study on P92 steel welding residual stress and its effect on the high temperature life[D]. Tianjin:Tianjin University, 2011.
    [12]
    刘明, 吴刚, 黄海, 等. 基于三维有限元的高温蒸汽管道弯头应力分析[J]. 黑龙江电力, 2019, 41(6):526-530.

    LIU M, WU G, HUANG H, et al. Stress analysis on elbow of high temperature steam pipeline based on three-dimensional finite element method[J]. Heilongjiang Electric Power, 2019, 41(6):526-530.
    [13]
    瓦卢瑞克·曼内斯曼钢管公司.T92-P92钢手册[C]//超(超)临界锅炉用钢及焊接技术论文集. 西安:电力行业电力锅炉压力容器安全监督管理委员会, 2007:285-304.

    Vallourec & Mannesmann Tubes Corp. T92-P92 steel manual[C]//Collection of Papers on Ultra (Super) Critical Boiler Steel and Welding Technology. Xi'an:Electric Power Industry Electric Boiler and Pressure Vessel Safety Supervision and Administration Committee, 2007:285-304.
    [14]
    刘成清, 彭强, 赵世春. 膨胀弯管在管道柔性设计中的定性分析[J]. 计算机辅助工程, 2012, 21(1):55-59.

    LIU C Q, PENG Q, ZHAO S C. Qualitative analysis of expansion bend in pipeline flexibility design[J]. Computer Aided Engineering, 2012, 21(1):55-59.
    [15]
    梁木子. 发电站蒸汽管道支管及接管座温度场和热应力分析[D]. 上海:上海交通大学, 2007.

    LIANG M Z. Temperature and thermal stress analysis of the steam pipe and correlative branch pipe of power plant[D]. Shanghai:Shanghai Jiaotong University, 2007.

Catalog

    Article views (5) PDF downloads (2) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return