HUANG Wei-hao, ZHANG Rui, TANG Song-qing, ZHAO Zhong-ping, PENG Hang-jin. Prediction and Experimental Verification for Residual Life of F12 Main Steam Pipe with Operation Time of 150 000 h[J]. Materials and Mechanical Engineering, 2014, 38(1): 90-95.
Citation: HUANG Wei-hao, ZHANG Rui, TANG Song-qing, ZHAO Zhong-ping, PENG Hang-jin. Prediction and Experimental Verification for Residual Life of F12 Main Steam Pipe with Operation Time of 150 000 h[J]. Materials and Mechanical Engineering, 2014, 38(1): 90-95.

Prediction and Experimental Verification for Residual Life of F12 Main Steam Pipe with Operation Time of 150 000 h

More Information
  • Received Date: October 11, 2013
  • Experimental study were carried out on creep-rupture strength and high-temperature creep crack initiation and propagation rate (CCGR) for sampling bend of main steam pipe with an accumulated operation time of 150 000 hours. The Larson-Miller equation of original material was determined based on statistical data of high temperature creep-rupture strength of F12 steel. The residual life and an equivalent operating stress of sampling blend were estimated by Larson-Miller equation and creep-rupture strength datas of the sampling blending, and then a high-temperature creep crack initiation and propagation life evaluation method was used to compute the high-temperature creep crak initiation and propagation life of the sampling blend under equivalent stress condition, meanwhile, the residual life was evaluated. At last, the prediction results were verified by microstructure of the sampling blend. The results show that the main steam pipe might had a residual life of 73 515 hours with an equivalent operating stress of 103.97 MPa based on Larson-Miller method, while using creep crack initiation and propagation life evaluation method, the residual life was 153 354 hours. The main steam pipe could operate normally for nearly ten years in safety. The prediction results was agreement with the experimental results.
  • [1]
    李耀君, 任爱.火电厂重要部件的寿命管理[J].热力发电, 1999(4): 42-46.
    [2]
    田文莉.火力发电设备剩余寿命评价技术[J].电力情报, 1994(1): 97-102.
    [3]
    VISWANATHAN R. Damage mechanisms and life assessment of high temperature components[M].Ohio:ASM International,1989:59-103.
    [4]
    STOPPATO A, BENATO A, MIRANDOLA A. Assessment of stresses and residual life of plant components in view of life-time extension of power plants[C]// Proceedings of ECOS 2012-the 25th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems. Perugia:[s.n],2012.
    [5]
    European creep collaborative committee (ECCC).Residual life-assessment and microstructure[R].[S.l.]:[s.n],2005.
    [6]
    宋志坤, 刘伟, 何庆复.金属材料热疲劳寿命的定量研究方法[J].机械工程材料, 1999, 23(5): 4-5.
    [7]
    蔡庆木, 刘月明, 黄昌清, 等.火电厂高温压力管道寿命预测模型的可靠性及进展[J].机械工程材料, 2012, 36(12): 5-9.
    [8]
    潘文越, 高向东, 凌祥.高温炉管剩余寿命评价技术最新进展[J].江苏化工, 1997, 25(1): 14-16.
    [9]
    崔朝英, 乔学亮.火电厂主蒸汽管道寿命评估方法[J].华北电力技术, 2002(11): 51-54.
    [10]
    NONAKA I. Residual life evaluation and repair procedures for high temperature boiler piping[J].OMMI, 2003,2(1):1-14.
    [11]
    莫剑. 压力容器及管道剩余寿命的评估方法[J].化工装备技术, 2004, 25(5): 32-34.
    [12]
    杨王玥, 李志文.θ法预测12Cr1MoV钢主蒸汽管道材料剩余寿命[J].金属学报, 1999, 35(7): 721-725.
    [13]
    高锋, 刘晖, 樊玉光, 等.蒸汽管道剩余寿命评估方法评述[J].腐蚀与防护,2008,29(5):295-297.
    [14]
    郑晓红, 赵翔, 曹欣玉, 等.锅炉高温承压部件剩余寿命的评估及应用[J].锅炉技术, 2003, 34(4): 24-29.
    [15]
    束国刚, 李益民, 梁昌乾, 等.10CrMo910钢薄壁主蒸汽管道θ法寿命评估及其应用研究[J].热力发电, 2000(4): 36-41.
    [16]
    陈国宏.由内壁氧化层厚度测评过热器管道的剩余寿命[J].河南科技大学学报, 2004, 25(6): 24-27.
    [17]
    李耀君, 任爱.应用老化因子方法评估高温部件的状态和寿命[J].热力发电, 2002(3): 46-48.
    [18]
    姜鹏,徐鸿,韩静茹.基于概率理论的主蒸汽管道寿命可靠性评估[J].现代电力, 2008,25(5): 35-39.
    [19]
    HU Zheng-fei. Heat-resistant steels, microstructure evolution and life assessment in power plants[M]//Thermal Power Plants.[2013-05-20]. http://www.intechopen.com/books/thermal-power-plants/heat-resistant-steels-microstructure-evolution-and-life-assessment-in-power-plants.
    [20]
    张军,王志武,原素芳,等.高井电厂1号炉主蒸汽管直管段剩余寿命评估[J].黑龙江电力, 2004, 26(5): 389-394.
    [21]
    DOBRZANSKI J. The classification method and the technical condition evaluation of the critical elements′ material of power boilers in creep service made from the 12Cr-1Mo-V[C]//13th Internation Scientific Conference on Achievements in Mechanical and Materials Engineering. Poland:AMME,2005:107-112.

Catalog

    Article views (3) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return