Citation: | CUI Bing-yan, GUO Sheng-li, CHEN Li-wen. Finite Element Analysis in Pulling Process of Different Technics of Beryllium Bronze Tubing[J]. Materials and Mechanical Engineering, 2007, 31(12): 75-78. |
[1] |
Welf-Guntram Drossel,Martin Hlldebrand,Cskar Pawelskl.FEM-analysis of the friction process in section drawing[J].Steel Research,1998,69(8):330-333.
|
[2] |
Karnezis P,Farrugia D C J.Study of cold tube drawing by finite-element modeling[J].Journal of Material Processing Technology,1998,80/81(4):690-694.
|
[3] |
杜凤山,吴维勇,刘才,等.管材空拔成形过程的计算机仿真[J].工程力学,1998,15(3):77-81.
|
[4] |
韩宝云,金明,钟倩霞.钢管冷拔过程计算机有限元仿真研究[J].钢管,2000,29(8):23-27.
|
[5] |
刘锦云,刘传璞,陶小贤,等.钢管短芯棒拉拔过程应力场的数值模拟[J].钢铁,2005,40(4):53-56.
|
[6] |
黄成江,李殿中,戎利建,等.多道次拉拔管的三维弹塑性有限元分析[J].钢铁研究学报,2000(3):27-30.
|
[7] |
申卫华,刘化民,张士宏.铜管游动芯头拉拔道次优化的弹塑性有限元模拟[J].锻压技术,2005(3):39-42.
|
[8] |
申卫华,李张刚,刘化民,等.铜管游动芯头拉拔模具角度优化的有限元模拟[J].塑性工程学报,2005,12(4):61-64.
|
[9] |
赵志业.金属塑性加工力学[M].北京:冶金工业出版社,1987.
|
[10] |
胡龙飞,刘全坤,王强,等.管材拉拔三维弹塑性有限元数值模拟[J].锻压装备与制造技术,2004(3):70-72.
|
[11] |
温景林.金属挤压与拉拔工艺学[M].沈阳:东北大学出版社,1996.
|